Changes between Version 10 and Version 11 of EdirBannerExtract


Ignore:
Timestamp:
09/11/13 12:27:20 (11 years ago)
Author:
lttoth@…
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • EdirBannerExtract

    v10 v11  
    1414      a. Click OK on the pop-up 
    1515      a. Click OK on the Chains Window (Bottom right) 
    16    1. Select Schedules from tabs at the top of the window.   
     16   1. Select Schedules from tabs at the top of the window.  ![4] 
    1717     a. Update Scheduled End Date and if desired, Scheduled Start Date  
    1818     a. Hit OK on the pop-up 
    1919     a. Click OK on the Chains Windows (Bottom right) 
    2020 
     21===  ![1] Find the with the chain search button === 
    2122![1][[Image(chain_search_button.png)]][[br]] 
     23 === ![2] Copy the current EDIR_EXT_YYYSS_RPTP chain === 
    2224![2][[Image(rename_chain_window.png)]][[br]] 
     25=== ![3] The qualifying term is one year previous  === 
    2326![3][[Image(extract_prompt_update_window.png)]][[br]] 
     27=== ![4] Select Schedules === 
    2428![4][[Image(BannerEDIR_Schedules.png)]][[br]] 
    2529[[br]][[br]][[br]]